Fritz inspects the contractors’ work

We’re putting in an electric gate as part of our improvement plan. In the last few days the track has been laid and conduit has been installed to bring in the electric supply. The gate is being fabricated and should be installed in a couple of weeks.

Fritz is at the left between the fence and the trench. The electric cabling will originate in the potting shed (at right), which already has power, and run to the box marked with a yellow flag.